How to ensure the safety of construction when using large diameter long guide rail rear soil discharge spiral pipe jacking machine for operation?
Publish Time: 2025-06-17
1. Preliminary preparation stageBefore any project using large diameter long guide rail rear soil discharge spiral pipe jacking machine begins, detailed preliminary preparations must be carried out to ensure the safety of construction. First, a comprehensive assessment of the construction site is required, including information such as geological conditions, groundwater level, and underground pipeline distribution. This step is crucial because different geological conditions may affect the selection and operation of the equipment. In addition, a detailed safety plan and emergency plan must be formulated to clarify the various risks that may arise during the construction process and their response measures.Secondly, all personnel involved in the construction should receive special training to understand the operating procedures and safety precautions of the equipment. The training content is not limited to the basic operation of the equipment, but should also cover emergency response methods, such as equipment failures, sudden geological changes, and other situations. In this way, safety accidents caused by human errors can be effectively reduced.2. Equipment inspection and maintenanceIn order to ensure safety during construction, regular inspection and maintenance of large diameter long guide rail rear soil discharge spiral pipe jacking machine is essential. Before each start, the operator needs to carefully check whether the key components of the equipment, such as the hydraulic system, electrical control system, and spiral conveying device, are working properly. Especially for those components that directly affect the stability of the equipment operation, they should be repaired or replaced in time once problems are found.In addition to daily inspections, a complete maintenance system needs to be established. Regularly conduct a comprehensive inspection of the equipment according to the guidelines provided by the manufacturer, and record the specific circumstances of each maintenance. Doing so can not only extend the service life of the equipment, but also detect potential problems in time and avoid accidents during the construction process.3. Site safety managementSafety management of the construction site is equally important. First of all, obvious warning signs should be set up to remind passing pedestrians and vehicles to pay attention to safety. Especially when working at night, lighting facilities should be added to ensure a clear field of vision. At the same time, protective railings or other physical isolation measures should be set up around the excavation area to prevent unrelated personnel from entering the dangerous area.In addition, since the large diameter long guide rail rear soil discharge spiral pipe jacking machine will generate certain noise and vibration during operation, it is necessary to take appropriate noise reduction measures and monitor the environmental quality around the construction site to prevent noise pollution from affecting surrounding residents. If the work is carried out in densely populated areas such as urban centers, it is even more necessary to strictly control the construction time and try to avoid residents' rest periods.4. Real-time monitoring and emergency responseModern large diameter long guide rail rear soil discharge spiral pipe jacking machines are usually equipped with advanced sensors and monitoring systems, which can monitor the operating status of the equipment and changes in the surrounding environment in real time. With these technical means, abnormal situations can be discovered at the first time and corresponding adjustments can be made. For example, when encountering problems such as sudden changes in the formation or groundwater leakage, the operation can be stopped immediately and corresponding remedial measures can be taken.At the same time, in order to cope with possible emergencies, the construction site should be equipped with sufficient emergency rescue materials and professionals. Once a safety accident occurs, forces can be quickly organized for rescue to minimize losses. In addition, emergency drills should be carried out regularly to improve the emergency response capabilities of all staff.When using large diameter long guide rail rear soil discharge spiral pipe jacking machines for operations, ensuring construction safety is a systematic project involving multiple links such as preliminary preparation, equipment inspection and maintenance, and on-site management. Only by starting from every detail and strictly implementing various safety regulations can the goal of safe production be truly achieved.