When using large diameter long guide rail rear soil discharge spiral pipe jacking machines for operations, ensuring construction safety is a systematic project involving multiple links such as preliminary preparation
When using large diameter long guide rail rear soil discharge spiral pipe jacking machines for operations, ensuring construction safety is a systematic project involving multiple links such as preliminary preparation
The hardware configuration and performance of the guided mud-water balance pipe jacking machine are the basic conditions that affect the guiding accuracy.
Choosing a pipe roof drilling rig suitable for specific geological conditions is a key step to ensure construction efficiency and project quality.
Traditional underground pipeline construction often requires large-scale ground excavation, which can cause serious damage to urban roads, green areas, etc.
As an advanced trenchless underground pipeline laying equipment, the front soil spiral pipe jacking machine has shown great application potential in the field of underground pipeline laying due to its advantages of high efficiency
With the changes in the economic situation in foreign and domestic markets, the company will adjust its strategy from 2024, and will increase the cultivation of export markets while steadily promoting domestic sales.